Muzata

Floating Stairs

Walking in Air
Breaking with Flair

Free Design & Quote →
楼梯落地页手机版首屏.jpg__PID:d9cf5a25-c6b0-4432-a9d6-25aab5706afd

Muzata

Muzata

Floating Stairs

Floating Stairs

Walking in Air
Breaking with Flair

Expertise You Can Trust

Expertise You Can Trust

Free design/Compliant with regulations/Worry-free installation

楼梯落地页手机版第二屏V2.0.jpg__PID:cc63d3e3-f07f-40e7-8bfc-74d998ca47b5
Muzata Floating Stair
Minimalism Floating Stair System

Mono

stringer stair

Minimalism Must-Have

  • Mono stringer structure
  • Easy installation
Get A Quote →

Double

Plate stair

Front and Back Transparency Expanded Space

  • Dual stringer structure
  • Unobstructed view
Get A Quote →
Double Plate Stair system

Double

Plate stair

Front and Back Transparency Expanded Space

  • Dual stringer structure
  • Unobstructed view
Get A Quote →
Zig Zag Stair System

Zig

Zag stair

The Rhythm of Steel
Awaken Your Home

  • Dual stringer structure
  • Dynamic and vibrant
Get A Quote →

About Muzata Floating Stairs

Open riser design

Open riser design

The types of stairs

Mono stringer        Double palte           Zig zag

house

Custom to your space

Cable railing & Glass railing

Cable railing                     Galss railing

关于悬浮楼梯.jpg__PID:7b7ecc97-acd2-4f57-afc4-041ccd0f4506

7 Steps to Your Stunning Floating Staircase!

01
02
03
04
05
06
07

Design Form Submission
Further Confirm Project Details (Approx. 2 days)
Muzata Provides Initial Proposal and Quotation, Client Pays 50% Deposit(Approx. 3 days)
Muzata Submits Design Drawings for Client Confirmation and Signature(Approx. 3 days)
Production Commences
Production Completion, Client Pays Remaining Balance, Product Shipped
Installation Guidance (Video/Manual)

7 Steps

to Your Stunning Floating Staircase!

01

02

03

04

05

06

07

Design Form Submission

Further Confirm Project Details (Approx. 2 days)

Muzata Provides Initial Proposal and Quotation, Client Pays 50% Deposit(Approx. 3 days)

Muzata Submits Design Drawings for Client Confirmation and Signature(Approx. 3 days)

Production Commences

Production Completion, Client Pays Remaining Balance, Product Shipped

Installation Guidance (Video/Manual)

The Next Step: kick off your floating staircase project!

The Next Step: kick off your floating staircase project!

FAQs